Contoh Terjemahan 5 Data Investigation Report Of Nickel Mine

Contoh terjemahan 5 (dari Bahasa Mandarin ke dalam Bahasa Inggris):

Teks asli (dalam Bahasa Mandarin):

印尼B公司SP镍矿山资料调查报告
一、    概况
1.1 目的
前期我司与印尼 B公司合作开发印尼东加里曼丹LK镍矿山,随着合作深入开展,该公司了解到我公司是致力于从事矿山生产-销售-工厂加工-产品一条龙的生产经营模式,以及我司对印尼本地镍资源的继续投资开发,该公司提出将自己公司所拥有的印尼北马古鲁岛哈马黑拉省韦达县赛波SP)红土型镍矿山合作矿山生产、销售。
1.2 任务
此次工作的主要重点在于对该矿山已有资料的查阅,为公司提供相对准备的数据与印尼B公司准备进一步商讨提供较为详细的矿山情况。
二、    矿山历史
矿山前身2004年由 W公司所持有,矿权面积1700公顷,20076月东哈政府将该矿权收回并分割为两个矿权,面积缩减至1330.8公顷,由 B公司持有至今。
2010年我公司高级地质工程师钟先生前往该矿山实地考察并完成矿山考察报告(见印度尼西亚北马古鲁省韦达县赛波红土型镍矿地质踏勘报告)。
三、  资料收集
Volume 1-Executive Summary Volume 2-lease documentdatabase and validation documents Volume 3-wellsite logsVolume 4-analysiscertificatesVolume5-topographicsurveydateresource estimate dateJORC guidelinespermit for reporting resource estimate、CV. D's employees以及钻孔柱状图(2本),环评与社区发展报告(四本),勘探报告(两本)。
四、  探矿工作进程
2007B公司组织本国地质工程师前往矿权踏勘考察,获取相关地质资料。此次将矿权划分为6个块段 TALAGAMORO-MOROUNI-UNILOI KUMELAKA UKENDODOKAN,通过探井及样品化验结果估算出资源量
20084-20092月根据前期相关地质资料,布置并完成相应钻孔勘探。此次勘探科学的并将原有的区块重新划分,以每个正方格80公顷为基准划分(见附图1),完成相应的具有JORC标准资质勘探报告(报告为英文版), AKA UKEN区域内完成50×50米勘探, TALAGAMORO-MOROUNI-UNILOI KUMEL区域内完成100×100米勘探, DODOKAN区域未做勘探工作。
2009-2010年对样品结果较好的区块MORO-UNI之间勘探区块B4加密至25×25米,由另一家勘探公司(未具备JORC标准资质)出具相关报告(报告为印尼文版)。
2010-2011年对C4块段内加密至25×25,出具相关钻孔模型数据结果(报告为印尼文版)。


五、  探矿工程结果

51  2007估算资源量

名称
分界品位
资源量(吨)
镍(%
铁(%
AKE
1.83
4,124,402
1.08
31.46
1.83
297,877
2.1
15.32
总计
4,422,279
1.15
30.37
UNI
1.76
10,321,572
1.1
38.0
1.76
1,183,935
2.1
23.17
UNI
总计
11,505,507
1.2
36.47
MORO
1.82
7,078,736
1.12
36.85
1.82
3,122,970
2.1
18.97
总计
10,201,706
1.42
31.38
LOI
2.06
2,120,093
1.08
35.11
2.06
25,513
2.1
24.29
总计
2,145,606
1.09
34.98
ALL
1.82
23,644,802
1.1
36.26
1.82
4,630,294
2.1
19.84
总计
28,275,097
1.26
33.57

5.2. 2009年资源量估算
2009年勘探报告资源量划分标准:控制资源量,勘探网度控制在100×100,最低可采厚度1,外推资源量不大于50,品位划分0.8-1.8%(A)和>1.8%(B); 推断资源量,勘探网度控制在100×100米以上,最低可采厚度1,外推资源量不大于25,品位划分0.8-1.8%(A)和>1.8%(B)

块段
资源量
品位
控制
推断
镍(%
铁(%
AKE UKEN
218,860
5,112
2.09(B)
17.29
1,982,439
294,820
1.19(A)
19.53
合计
2,201,299
299,932
1.27
19.33
UNI UNI
1,016,220
6,817
2.1(B)
18.71
1,1910,829
182,686
1.25(A)
25.62
合计
12,927,048
189,503
1.32
25.08
MORO MORO
1,062,241
101,568
2.15(B)
25.07
4,243,890
1,052,490
1.22(A)
33.24
合计
5,306,131
1,154,058
1.39
31.77
LOI KUMEL
0
3,408
1.8(B)
42.25
753,871
83,504
1.08(A)
21.95
合计
753,871
86,912
1.08
22.03
TALAGA
0
58,964
2.63(B)
29.0
0
528,903
1.16(A)
45.2
合计
0
587,867
1.3
43.58
总计
2297321
175,869
2.13(B)
21.85
18,891,029
2,142,403
1.23(A)
27.22
总和
21,188,350
2,318,273
1.32
26.66

53  2010年资源量估算
2010年完成了矿权内镍矿石品位较好地段MORO-UNI区块间的B4内三小块(A,B,C)25×25米的勘探工作,此次资源量估算以镍品位0-6%笼统计算。
区块
边界品位(%
体积
资源量()
镍(%
铁(%
网度控制
A
0-6
583536
875304
15
2069
25
×
25
B
0-6
878916
1318374
15
1713
C
0-6
1445528
216792
156
1599
合计(ABC

2393651
3590477
147
1991
AKE UKEN
0-6
8817698
13226547
079
1562
50×50
MORO-UNI
0-6
27895693
41843540
105
2291
100×100

54  2011年资源量估算
2011年勘探报告仅是对区块C4加密到25×25米的勘探报告,且结果还处于钻孔模型数据,未做总体计算。

Hasil terjemahanku (dalam Bahasa Inggris):



DATA INVESTIGATION REPORT OF SP NICKEL MINE OF PT. B

1.    OVERVIEW

1.1  THE PURPOSE:

In the early period of the partnership between our company and Indonesian company, PT. B, in order to develop Nickel Mine in LK, East Kalimantan. During our partnership, our corporate business partner understand that our company will do the best to realize our business schemes of production in the circle of mining production, marketing, manufacturing and product. For the continued of the investment exploitation of the local Indonesian nickel mine resources, our corporate business partner has proposed the partnership of Mining production and marketing for their lateritic nickel mine in SP, Halmahera, North Maluku, Indonesia. 

1.2 THE TASK:

The main focus of the task is the investigation of the existing data of mining, to prepare and provide relative and more detailed data concerning Mining situation in accordance with the further discussion with Indonesian company, PT.B.

2.    THE HISTORY OF MINING

The previous mine owner in 2004 is PT. W which owned for 1.700 hectare of Mining rights. In June 2007, The government took back the ownership of the mining rights and divide it into two mining rights and reduced the area broad for 1.330,8 hectare which was owned by PT. B till now.

In 2010, our Senior Geologist, Mr. Z went to The Mining site to conduct the research & survey and he finally completed his research & survey report (Please see The Geological and topographical survey report of Laterite Nickel Mine at SP, Maluku, Indonesia).

3.    DATA COLLECTION

Volume 1 - Executive Summary, Volume 2 - lease document, database and validation documents, Volume 3 - wellsite logs, Volume 4 - analysis certificates, Volume 5 - topographic survey date, resource estimated date, JORC guidelines, permit for reporting resource estimation, CV. D's employees and Drilling Histogram (2 Volume), The environmental impact assessment & community development report (4 volume), Exploration report (2 volume).

4.    WORK PROCESS OF EXPLORATION

In 2007, PT.B organized the  local geologists to go to the mining site for research and survey. They got the relevant geological data. At this time, the mining rights had been divided into 6 (six) blocks. The blocks were TALAGA, MORO-MORO, UNI-UNI, LOI KUMEL, AKA UKEN and DODOKAN. From well exploration and the result of sampling analysis, finally got the estimated amount of resources.

From April 2008 to February 2009, According to the early period of the related geological data, finally settled and completed the appropriate drilling exploration. This time, the science exploration of the original block was being re-divided. For each is divided into 80 hectare per square as benchmark (please see Picture 1). The appropriate completed drilling exploration has the standard qualification exploration report from JORC (Report in English version). The exploration completed in AKA UKE area was 50×50 m. And the exploration completed in TALAGA, MORO-MORO, UNI-UNI, LOI KUMEL areas were 100×100 m. DODOKAN area has no exploration activity.

From 2009 to 2010, in the area of MORO-UNI which has better result of sample, in Block B4 have  encryption up to 25 x 25 m , based on the related report issued by another exploration company which has no standard qualification of JORC (Report in Indonesian version).

In 2010 to 2011, in the block of C4 has encryption up to 25 x 25 m, based on the related data result of drilling model (Report in Indonesian version).



5.    EXPLORATION ENGINEERING RESULT

5.1 The estimation of resources amount in 2007:

Name
Content
ResourcesTon
Ni%
Fe%
AKE
1.83
4,124,402
1.08
31.46
1.83
297,877
2.1
15.32
Total
4,422,279
1.15
30.37
UNI
1.76
10,321,572
1.1
38.0
1.76
1,183,935
2.1
23.17
UNI
Total
11,505,507
1.2
36.47
MORO
1.82
7,078,736
1.12
36.85
1.82
3,122,970
2.1
18.97
Total
10,201,706
1.42
31.38
LOI
2.06
2,120,093
1.08
35.11
2.06
25,513
2.1
24.29
Total
2,145,606
1.09
34.98
ALL
1.82
23,644,802
1.1
36.26
1.82
4,630,294
2.1
19.84
Total
28,275,097
1.26
33.57

5.2 The Estimation of Resources amount in 2009:

The standard division of resources amount in exploration report of year 2009:The control of resources amount, exploration network is controlled at 100 x 100 m, Minimum depth can drill 1 m, extrapolation of resources amount is no bigger than 50 m, content division 0.8-1.8%(A) and 1.8%(B); conclude of resources amount, the network control of exploration at above 100×100 m, minimum depth can drill  1 m, extrapolation of resources amount is no bigger than 25 m, content division 0.8-1.8%(A) and 1.8%(B)



Block
Resources amount
Content
Control
Conclude
Ni%
Fe%
AKE UKEN
218,860
5,112
2.09(B)
17.29
1,982,439
294,820
1.19(A)
19.53
Total
2,201,299
299,932
1.27
19.33
UNI UNI
1,016,220
6,817
2.1(B)
18.71
1,1910,829
182,686
1.25(A)
25.62
Total
12,927,048
189,503
1.32
25.08
MORO MORO
1,062,241
101,568
2.15(B)
25.07
4,243,890
1,052,490
1.22(A)
33.24
Total
5,306,131
1,154,058
1.39
31.77
LOI KUMEL
0
3,408
1.8(B)
42.25
753,871
83,504
1.08(A)
21.95
Total
753,871
86,912
1.08
22.03
TALAGA
0
58,964
2.63(B)
29.0
0
528,903
1.16(A)
45.2
Total
0
587,867
1.3
43.58
Total
2297321
175,869
2.13(B)
21.85
18,891,029
2,142,403
1.23(A)
27.22
Grand Total
21,188,350
2,318,273
1.32
26.66


5.3 The estimation of resources amount in 2010:

In 2010, had completed 25 x 25 m of exploration work at the 3 small blocks (A,B,C) at the block of B4 in the area of MORO-UNI which have better grade of nickel ore. This time, the estimation of resources amount is generally computed based on nickel content 0-6 %.

Block
Content%
Volume  
Resources Amount()
Ni%
Fe%
Network Control
A
0-6
583,536
875,304
1.5
20.69
25
×
25
B
0-6
878,916
1,318,374
1.5
17.13
C
0-6
1,445,528
216,792
1.56
15.99
TotalABC

2,393,651
3,590,477
1.47
19.91
AKE UKEN
0-6
8,817,698
13,226,547
0.79
15.62
50×50
MORO-UNI
0-6
27,895,693
41,843,540
1.05
22.91
100×100

5.4 The estimation of resources amount in 2011:

In 2011, the exploration report is only the extrapolation of Block C4 up to 25 x 25 m, and the result is based on the data of drilling model, without making the overall calculation.